
定制-觀察井模具-圓形方形觀察井模具-優質廠家
價格
訂貨量(套)
¥1600.00
≥20
店鋪主推品 熱銷潛力款
専將將將將尃尃將尃専尃
在線客服
定制 觀察井模具 圓形方形觀察井模具 優質廠家
觀察井模具分類與結構還是以實際形狀、尺寸為主的,而且對于觀察井使用區域的劃分,往往是以內蒙古、山西、山東、吉林等地區應用為主,該模具主要是分成了內外兩模,因此在使用的時候要選擇配套的內模與外模一起進行組合使用,而且要保證好內模與外模的厚度是一致的,使用模具進行預制件制作的好處,就是可以讓水泥快速的成型,當然也可以用來保證好檢查井的尺寸。內模與外模需要放置在一起,內模放置在內里,與外模之間的間隙用來進行泥漿的澆筑,只有這樣才能夠讓制作出來的檢查井預制件符合施工的要求。在進行檢查井預制件加工的時候,要保證好內模與外模的放置穩定,不能夠出現松動或者是固定不標準的問題,而觀察井模具與泥漿需要接觸的地方則是需要進行刷油的,如果沒有刷油這一步的話,會加重泥漿在模具表面粘連的情況,從而出現脫模困難的問題,以及觀察井預制件成型后不符合工程的施工要求。而且澆筑上泥漿后的觀察井模具是不能夠隨意去進行移動的,避免會出現泥漿泄露的問題,在震動的時候需要使用的則是振動棒來進行氣泡的排出。
The mold classification and structure of the observation well are mainly based on the actual shape and size, and the division of the use area of the observation well is often based on the application of Inner Mongolia, Shanxi, Shandong, Jilin and other regions. The mold is mainly divided into two internal and external molds, so the matching internal mold and external mold shall be selected for combined use when using, and the internal mold and external mold shall be well guaranteed The thickness is the same. The advantage of using mold to make prefabricated parts is that the cement can be quickly formed, and of course, it can also be used to ensure the size of inspection well. The internal formwork and the external formwork need to be placed together, the internal formwork is placed in the interior, and the gap between the internal formwork and the external formwork is used for mud pouring, only in this way can the prefabricated parts of the inspection well meet the construction requirements. When processing the prefabricated parts of the inspection well, it is necessary to ensure the stable placement of the internal mold and the external mold, and the problem of looseness or non-standard fixation cannot occur. The place where the mold of the observation well needs to contact with the mud needs to be brushed. If there is no brushing, it will aggravate the situation of mud adhesion on the mold surface, so as to cause the problem of difficult demoulding And the prefabricated parts of observation well do not meet the construction requirements after forming. Moreover, the observation well mould after pouring the mud can not be moved at will to avoid the problem of mud leakage. When vibrating, the vibrator is used to discharge the bubble.

